Font Size: a A A

The Post Project Evaluation For FGD In Thermal Power Plant

Posted on:2009-06-25Degree:MasterType:Thesis
Country:ChinaCandidate:H L GuoFull Text:PDF
GTID:2189360245475394Subject:Project management
Abstract/Summary:PDF Full Text Request
After the evaluation of projects based on the principles and power plant flue gas desulphurization, the characteristics of the corresponding two-story comprehensive evaluation index system is established. Application of fuzzy comprehensive evaluation, the Huaneng Power Plant in Qufu flue gas desulphurization project evaluation model is made. Level of analysis is used to determine the weight indicator which using membership functions to calculate. This model was applied to the Huaneng Power Plant No.1 unit and No.2 in Qufu. Evaluation findings are based on the results of the analysis. Verification of the pre-construction feasibility study is important to the future of the project and construction.
Keywords/Search Tags:Post-project evaluation, FGD(flue gas desulphurization), Fuzzy comprehensive evaluation model, Index System
PDF Full Text Request
Related items