Font Size: a A A

Projects Schedule Management In The Communications Construction Engineering

Posted on:2011-10-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y J LiuFull Text:PDF
GTID:2189360308452201Subject:Project management
Abstract/Summary:PDF Full Text Request
In the communication base station construction process, to adopt various measures to reduce the construction cost, compression cycle, and to respond to market demands, is to improve communication operators guarantee of market competitiveness.This article combines the communication enterprises of mobile communication engineering construction features, focus on analysis and discussion of a communication base station construction of the current situation and problems. Use the project schedule management of PMS (Project Milestone Schedule);WBS (Work Breakdown Structures);CPM (Critical Path Method),;and other tools & methods, on the main influence base station construction progress on the issues for analysis. And for some of the problems with the technology tools to conduct an in-depth study.This article was previously published research findings in a communications has been implemented so that the base station's construction progress substantially improved and achieved good results.
Keywords/Search Tags:base station construction, schedule management, Network planning, CPM, WBS
PDF Full Text Request
Related items