Font Size: a A A

Study On Rcpsp Of Complicated Products' Design

Posted on:2011-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:X J LiuFull Text:PDF
GTID:2189360308473543Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The process of complicated products design has the characters of high complexity, long period and various requirement of resource. So a reasonable resource scheduling scheme has great significance to the design of complicated product, so as to shortening product development cycles and reducing the cost of product. How to make a reasonable resource scheduling in the conduct of resource-constrained is even with great significance.In this paper, we use the genetic algorithm and CCPM (critical chain project management) as the mainly solutions. On the study of genetic algorithm, providing a further improve to existing genetic algorithm in the result of forming a new adaptive immune chaos genetic algorithm. Moreover, check the validity under MATLAB7.0. First, we make an Original Project scheduling by the new adaptive immune chaos genetic algorithm, after that we use the management software Adept Tracker Professional to show the charts both of the development process and resource buffer plan. Trough these charts, people can effectively monitor the whole process of resource-constrained project scheduling and the resources progress of every project work module. Automobile design is a complex product design, the approach of making solutions which are solve the problems of traditional RCPSP to the process of complicated products design, is further develops both in theory and application for standard genetic algorithm.
Keywords/Search Tags:Complicated products design, Resource-constrained project scheduling, Genetic algorithm, critical chain, Automobile design
PDF Full Text Request
Related items