Font Size: a A A

Study On Scheduling And Controlling Of Transformer Made To Order

Posted on:2011-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:X ShenFull Text:PDF
GTID:2189360308952225Subject:Project management
Abstract/Summary:PDF Full Text Request
As the development of science and technology and the variety of market demand, enterprises are confronted with many challenges which have never occurred before. New management methods and production style are emerging continuously. Make-to-order has become a main trend of production, while problems such as resource conflict and multi-projects operation under the circumstance of make-to-order have also been the main obstacles which blocked the development of the company.This paper will discuss scheduling of transformer production project with critical path method, based on the characteristics of production process and structure of transformer manufacturer. Scheduling of single project, sequencing of projects and master scheduling under multi-projects environment will be introduced.Then it will analyze the main defects of current scheduling technology, such as ignorance of psychological factor of human being, impact from non-critical-path activities and mutual influence among projects. It is concluded that the key conflict of scheduling under multi-projects environment with make-to-order is the contention of resource.To resolve the conflicts, the paper will introduce critical chain method. First squeezing the lead time of activities and setting buffer to optimize project schedule, then set up system of scheduling and controlling of multi-projects including resource allocation, dynamic progress feedback and control of project delay, to balance the resource.Finally, the paper will demonstrate the effectiveness of the method based on sample of transformer production orders with Project software, and simulate the result with Monte Carlo method.
Keywords/Search Tags:transformer make-to-order, project scheduling and controlling, CPM, CCPM
PDF Full Text Request
Related items