| Perforation is used to make a hole in the segment containing oil of the oilwell,thus the liquid of oil layer can flow to the well. Gas burned by explosive can make fracture greater and longer , result in penetrability highten and output advanced. The effect of perforation and fracturation have derect ralation to the output of the oilwell. If the improper technics of them is used ,the well may be damaged and expensive prophase investment will wasted. The pressure data of the process of perforating,fracturing, restitution of the oil layer is crucial information for oil and gas field exploitation. It is of great use for studying the character of the oil layer , analysing the effect of the perforating and fracturing , making proper operating technics and providing datum for system design of stimgun. To test the dynamic parameter of the exploding stimgun in real time and real condition down the 5000m oilwell,the instrument should work well in the condition of 150℃,statstic pressure 50 MPa,±50000g acceleration.At the same time ,it consumes small power,diameter should less than 80mm, and have proper sampling strategy to satisfy test demand.Analyse and validate the work flow of the downhole pressure-test instrument farther more. Combined with the new need of downhole logging , sampling strategy with two modes are studied and designed for downhole dynamic test system ,mode 1: 4-time and 2-condition;mode 2: 1-time and 3-condition. The control logic and timing of the curcuit based on CPLD are designed and revised, resolve the"competetion and risk"in the cuicurt. Designed the digital trigger funtion , avioding error trigger. Data of the gauge can be read in any time,which is very usefull. The power supply is redesigned ,using DC-DC converter based on charge pump, and technic for filter the self-produced noise in the power converter.Make 3 different voltage power supplies using one big capability battery come ture , enlarging the power supply of the battery.With the structure of the batteries much more simple, avoid the risk of damige the curcuit when operate the 3 power supplies in false order. Problem of lose of programming data when power up is settled. Testing system is improved based on problems encontered in oil field and client request, making reliability higher , achieved the special instrument easy to use step by step.After the new-type test and measurement instrument have been developed, many corporations ordered it ,and DaQing, LiaoHe, ChuanNan comperny, TongYuan Ltd. have check and accept our products. Four type perforation : normal, out-hang, down-hang, extend aperture etc. are tested, acquire a lot of datum . It is tested that the gauge have very good work credibility and anti-jamming ability, can resist high-temperature and high-pressure with easy handling and high precision. |