Through the observation on Jiaozuo-Gongyi Yellow River Bridge project in He Nan province and by using the settlement data obtained in the project, the rules of uneven settlement in soft clay base there were studied in this paper. According to least square method, author programmed the software of base settlement prediction by Visual Basic6.0. The rules and the software can be applied in design and construction. |