Font Size: a A A

Bridge Expansion Device Damage Assessment Methods

Posted on:2006-11-30Degree:MasterType:Thesis
Country:ChinaCandidate:G N PuFull Text:PDF
GTID:2192360182465065Subject:Bridge and tunnel project
Abstract/Summary:PDF Full Text Request
Bridge expansion joint is very easily to be destroyed, and its destroy is not only descend the comfortable but also affect the structure of the bridge, even to the point of the security of the moving automobiles. But how to estimate and maintain the bridge expansion joint is an urgently problem to be solved by the manage department of the highway.Basis of the Henan province's seventeen district and more than four handred statistics data of the bridge expansion joint's condition, according to its composition and characteristic, this paper divided the bridge expansion joint as six types by its structure, and introduced every type's characteristic. Basis of the statistics data, we summarized the reason why the bridge expansion joint had been destroyed and what process the destroying was. We divided every type of the bridge expansion joint to different position as its function. Accepting the suggestion of the specialist's advice, and according to its principle of the operations, optimization, statistics, principle of matrix and so on, we used the AHP method and hierarchical clustering principle to determined every part's weight of the bridge expansion joint, put forward the standard process of the comprehensive estimate method & formulate, and defined the criterion table for the method.The standard process of the comprehensive estimate method is: Firstly, determined which type the bridge expansion joint was and what grade its part was; And then defined every part's figure refer the standard of every part's level for its destroyed, search for the weight of the part at the standard table, as the same method, we can fined the coefficient of traffic and the coefficient of structure; Finally, used the comprehensive estimate formulate we can get the estimated result, Then we can defined how to maintain the bridge expansion joint by reference the estimated result.At the last of the test, we introduced the process of the comprehensive estimate method by tow examples, we tested this method, the method is easy to be operated and accurately, this method can guide the maintain work of the bridge expansion joint.
Keywords/Search Tags:Bridge expansion joint, Destroy, Comprehensive estimate method, Weight, Maintain
PDF Full Text Request
Related items