Font Size: a A A

Three Gorges Bank Of Basic Information System Project Scope Management Studies

Posted on:2011-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:X Y ZhengFull Text:PDF
GTID:2199360308475718Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Since the full opening of China's financial industry. The competition among banks is more intense. With the increasing number of banks and homogeneity of product features. Make various commercial banks lacking the competitive advantage. Therefore. Various commercial banks want to promote the process reengineering and implementing service differentiation strategy with rapidly changing information technology. As soon as possible to customer-centric business environment and shaping their competitive advantage.How to determine the bank information system construction period and scope. management the project's demand under corporate strategic plans. Make the base information system of banks to enable to correspondence the changing market square in the future. To ensure that the banks can put a smaller investment to achieve maximum effect. This is a concern with problem for the bank management information system developers..In 2009, I participated in the Three Gorges Bank Limited "based information system" project construction. Served a part of the management work. The information system construction project is a key project in the Three Gorges Banks Limited. Get the company's leadership attaches great importance. On the basis of in-depth analysis the Three Gorges Bank Limited "based information system" project's overall strategy and demands in this paper. With the bank "based information system" scope of project management as the main object of research. And did the Exploratory Research. Pointed out that the limitations of the scope of traditional project management in dealing with the demand uncertainty. And to explore service-oriented component-based software architecture solution.
Keywords/Search Tags:Commercial bank, The base Information system, Scope management
PDF Full Text Request
Related items