Font Size: a A A

Feasibility Study On Phase I Project Of LYG - YH Tank

Posted on:2017-05-07Degree:MasterType:Thesis
Country:ChinaCandidate:L Y NiFull Text:PDF
GTID:2209330488455273Subject:Project management
Abstract/Summary:PDF Full Text Request
Our country has formed the Yangtze river delta, pearl river delta, bohai sea region three petrochemical chemical industry gathering area and more than 20 refining integration base. Coastal areas relying on markets and resources both at home and abroad, and the rapid development of export-oriented economy, the construction of a number of features high-end product of chemical industry park. Shanghai, nanjing, ningbo, huizhou, maoming, quanzhou petrochemical park has reached the international advanced level. China’s petrochemical industry development reflects the "base, large-scale, integrated, park industrialization " development characteristics.According to the domestic and foreign large-scale petrochemical industry park and base construction characteristics, adhere to the overall planning, a clear functional partition, scientific and overall planning, step-by-step implementation is the key factor in the success of the park. Especially for the planning and construction of warehousing logistics area in the petrochemical base, will affect the sustainable and healthy development of the large petrochemical industrial park directly, unified public logistics facilities, such as construction of docks and tank In petrochemical park will increasingly become the most scientific and universal model.Lianyungang petrochemical industry base of public the first phase of liquid tank farm project as the background, application of relevant theories and methods of the project feasibility study, starting from the macro and micro environment of the project, analysis of the new market environment, predict the market prospect of the project; Starting from the construction project the total process, analyze and compare the project in selected process technology and equipment, as well as the automation equipment configuration, etc., analyze the adopted by the technical feasibility of the project; From the perspective of environmental protection, the analysis of the project for the construction of regional environment impact analysis, and puts forward corresponding protective measures, at the same time, analyses the objective of the group project and human resource configuration, finally, analyzes the labor safety and protective measures in the project implementation; This project financial basis for the scientific estimation, on the basis of computing the corresponding financial evaluation indicators and project investment in construction, lease price, variable cost and production load sensitivity analysis, demonstrates the feasibility of this project financially.
Keywords/Search Tags:Feasibility study, Technique feasibility, Finacial evaluation, Sensitivity analysis
PDF Full Text Request
Related items