Font Size: a A A

Research Of Anyang Area Network "Twelfth Five" Planning

Posted on:2012-05-08Degree:MasterType:Thesis
Country:ChinaCandidate:G L LiFull Text:PDF
GTID:2212330338957450Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
With national economy and people's demand for electric power increasingly continuously, the electric network of our country can't fulfill the need of load's going up.In order to guarantee the national economy's growing in the future, except for power plants should be built and rebuilt, the spread and reconstruction of network involved large amounts of investment, and wrong decisions not only affect the safe circulation of the electric network itself but also result in huge economic loss. Therefore, improving scientific decisions level of network planning is a very urgent task in front of electric power staffs.With the rapid development of national economy in our country, electric power becomes more and more important. So it's necessary to ensure the safe and economical operation of power system. The network in our country is still weak, lack of reliability and highly wasted, it's obviously urgent to modify current status and make a reasonable planning of the network. Network plans, is the important constituent who develops national economy and the society in the power supply region. Simultaneously also is important foundation of one electric power enterprising own long term development plan.The goal of the electrical network plans is to make the development of electrical network to adapt satisfy and moderate in advance economical development in the power shoofly region. And it can display the decision function on regarding the electrical network construction, the movement and the power supply safeguard. The construction of medium voltage primary factor on impacting power supply quality and power supply reliability, relate entirely power distribution network for a long time develop and the foundation of the electrical network develops.If the view of the current construction and the economy development of Anyang area, and considering to the longtime planning of Anyang area, this article choose medium voltage power distribution plans as the research object, forecasting electrical load; in addition to computation of electricity, studying the objective and the principle of the electrical networks plan, in this foundation, plan the medium voltage network, also appraises invest. Through the constructions and transformations of power network, each aspect of Anyang area electrical networks will strengthen, and be able to receive the very good social benefit and the economic efficiency. The next economic and society developments will be solidly established from this.
Keywords/Search Tags:power network plans, Anyang area, load forecast, network optimization
PDF Full Text Request
Related items