| With the rapid development of the domestic economy and the city have been expanding, subway as to solve traffic problems, expanding the city scale, improving the city image and new measures to promote economic growth, building underground cities, more and more urban development in China has entered the "underground heat "era. However, the high cost of subway construction, huge investment on the construction of the city caused great pressure on local government that restricts the growth rate of the first subway problemsShenyang Metro Line length of 27.926 km, estimates the total cost of 11.766 billion Yuan, the average cost of 422 million Yuan / km, is the Shenyang City, the largest investment in urban infrastructure projects. Shenyang Metro Line project cost was originally forecast to cost 365 million / km to build a true sense of the national minimum cost of the subway line, which has been the cost control of the Corporation, Shenyang target. Shenyang Metro Line project in November 18, 2005 start, September 27, 2010 trial operation, construction period lasted for 5 years, Shenyang, the Corporation will Cost Control concept throughout the entire project management process, whether it is large to the construction program selection, equipment and technology selection, decoration materials, or small project than a series of decisions in the election, both in ensuring the safety, quality and reliable as possible while reducing the project cost.This article mainly for Shenyang the subway line project is a major child cost analysis, the final item by item forecast predicts a number line project is likely to cost, and from Shenyang the number one line project implementation in the decision-making process, design, tendering for construction of a few aspects, a summary of the project cost control measures.This article to predict the number of Shenyang in a line project cost purpose, hoping for a summary of the project cost control experience and lessons for Shenyang the new line of control provides the cost and useful data for other cities, the construction cost control to provide a reference.Subway Project is a comprehensive project, the factors that affect the project cost complex subway. This paper describes in five parts, one brief list of project cost control principles and focus on cost control subwaySecond is to introduce the Shenyang Metro Line project overview, economic indicators and analysis of Shenyang Metro Line project cost control difficultiesThird, according to Shenyang Metro Line project budget for the subjects, item by item analysis and forecast construction cost, and with other cities to compare the cost of subway lines; fourth is from Shenyang Metro Line project decision-making phase, design phase, bidding and construction stage, and several other aspects of cost control measures summary; fifth, Shenyang Metro Line project cost forecast summary and on this basis, cost control measures on the subway to make recommendations.This collection of Shenyang Metro Line project budget, contract, change and other large amounts of information, data, and on this basis, to collate, compare, analyze, all with the data speaking.The article also cost by comparison with other cities in Metro, judging from another point of view of Shenyang Metro Line project cost forecast is reasonable. |