Font Size: a A A

Communication Operator's Network Project Construction Cost Control Research

Posted on:2017-01-07Degree:MasterType:Thesis
Country:ChinaCandidate:H T GaoFull Text:PDF
GTID:2349330491463326Subject:Business administration
Abstract/Summary:PDF Full Text Request
As China has gradually liberalized telecommunications market regulation, competition among communications operators has been heated increasingly. Because process of network development and technology innovation among these communications operators is almost identical, competitive advantage resulting from technology carriers is so limited that cost controlling takes up a crucial role in rapid development of enterprises when communications operators compete as technique supporting enterprise. Communication Engineering Construction has basic characteristics of long cycle and large amount of investment, and how to utilize systematic and meticulous management tool to use and allocation of funds for construction investment, save all aspects of the investment and reduce engineering costs in purpose of getting higher market and social returns important subject internetwork construction.Taking WX City Metro Line ? Communication as research background, this paper reviews domestic and international cost control theories. We divide construction process of WX City Metro Line ? to various stages:investment decision-making, design, bidding, construction and completion phases, and propose using the trinity cost control thoughts including quality, process and expense to build WX City Metro Line ? construction project with entire process of control theory.On this basis, from the perspective of enforcement, this paper points out solution to WX City Metro Line Communications Construction. First, we develop enterprise culture about whole people and entire process participating in cost controlling. Second, we restructure the organization and build accountants appointment supervision mechanism. Third, we perfect performance assessment system and establish normal cost control assessment mechanism. Fourth, we optimize organization process to adapt for supply chain cost management strategy.
Keywords/Search Tags:Communication Project Construction, Cost Control, WX City Metro Line ?, Entire Life Cycle
PDF Full Text Request
Related items