Font Size: a A A

Colluding Construction Project Bidding Process Analysis And Countermeasures Research

Posted on:2012-04-06Degree:MasterType:Thesis
Country:ChinaCandidate:L J ChaFull Text:PDF
GTID:2219330338457121Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
In 1983, Lubuge Hydropower Station in China imported from abroad for the first time the concept of bidding. Through the project, the bidding system in China has been the promotion and rapid development. But in practice but there are many non-standard behavior, particularly in the series marked the most common.String scale behavior can be said that the industry is currently bidding the most common irregularities, It is not only seriously disturbed the normal market order bidding, damaged the interests of other bidders, and returned to the country and bring the tender huge economic losses. Based on the standard behavior of a huge string of harm, from the basic theory of bidding, a simple exposition of the tender and basic principles of several ways at first, then labeled with bidding to the basic theory of strings, standard problem of the huge string of hazards and their reason for existence, and the reasons for the existence of a simple summary. Second, the basic theory with the above, focus on the prevention and remediation of the behavior of serial standard, mainly taken in the course of qualitative analysis and quantitative analysis, experience in theory and practice of the method of combining, the use of personal theory qualitative analysis of the accumulation of knowledge,to some of the current provinces of quantitative analysis of the practical experience,common standard for the series of irregularities that raised some of their own prevention and remediation methods.
Keywords/Search Tags:Tendering, String marked, Strategy
PDF Full Text Request
Related items