A Study On The Construction Cost Control Of Sewage Treatment Project Phase Three In Laixi

Posted on:2012-10-02Degree:MasterType:Thesis
Country:ChinaCandidate:N X ZhangFull Text:PDF
GTID:2219330338964309Subject:Project management
Abstract/Summary:PDF Full Text Request
With economic development, people's living standards improve, people began to raise the level of material life in the pursuit of the same time, spiritual life more and more high-level requirements, especially for a higher environmental requirements. Expansion of the sewage treatment plant, improve the quality of the environment, the economy and improve people's quality of life provide a good environment foundation, has become increasingly important. Sewage treatment projects has construction projects on the basis of common problems, but also has its own special take you. Articles by Lacey sewage treatment project cost control of three studies, analysis of the impact to change the control of the project cost, cost control put forward proposals and measures, other construction projects for the sum up the experience of cost control is of positive significance .This paper construction project cost control and other related theories to Lacey sewage treatment project for the Phase III study, firmly grasp the characteristics of the sewage treatment project, from project preparation phase, construction phase and completion of final phase of work For cost control. The empirical analysis of Lacey sewage treatment projects in the construction of three main problems in the process, exploring aspects of cost control causes. In the experience of other construction project cost control on the basis of experience, combined with the sewage treatment project Lacey actual situation, Lacey sewage treatment works proposed to realize the control of project costs and reasonable proposal.Firstly, the construction project cost control theory are introduced, elaborated the theory of meaning. Lacey then introduced the current sewage treatment project construction background, describes the profile of sewage treatment projects, options, etc., to ascertain the environment in which to run the project. Then the project preparation stage, construction work phase, and the cost of the completed stage of the analysis to identify the various stages of the project cost in the state, through the analysis found that the cost of this project is part of the largest construction project, Equipment costs and installation works. Identify the major cost in the cost control and secondary costs, cost control measures for the next step of the proposed fully prepared to do. For the wastewater treatment project preparation stage must be to develop a good project cost control objectives, to facilitate this objective since the cost of building control. In addition, a reasonable choice of financing options is an important aspect of cost control, revenue for Lacey this small county-level city, BOT financing scheme is a good choice. Construction phase of the project cost control are established to promote the full implementation of the main tracking audit system, strict control of engineering changes, to strengthen visa oversight, reasonable arrangements for the duration, simplified organizational structure, improve the efficiency of decision-making and do the payment of project work. Completed stage of the project, will have to work really well completion and acceptance of a comprehensive well completion data archiving and timely arrangements for the audit work to ensure that time on account of fixed assets, standard audit procedures, strict implementation of relevant provisions of the audit.The main findings are:1, the analysis of the impact Lacey sewage treatment project cost control three factors that are both common problems of construction projects, but also the sewage treatment project Lacey's personality problems.2, for three sewage treatment projects Laixi where the economic and cultural conditions of the actual proposed construction scale of the project, financing, planning and design, construction, engineering and so on completion of settlement proposals and measures for cost control.3, Lacey summarized three sewage treatment project cost control is different from other construction projects of the Department: (1) sewage treatment project determines the profit Lacey sewage works construction project is different from the control of project cost Method; (2) sewage treatment project of positive externalities the larger determine Lacey sewage treatment project can not take the general project cost control measures.Innovations of the paper: construction projects in the system introduces the theory of cost control on the basis of its three sewage treatment applied to the Lacey project cost control measures. And to Lacey sewage treatment project for the three cases, combined with a variety of project construction, proposed the project under the complex pattern of cost control measures.
Keywords/Search Tags:sewage treatment, Engineering projects, Cost control, Cost analysis
PDF Full Text Request
Related items