Font Size: a A A

Study On Deadline Governance System In The Water Pollution Control Field

Posted on:2013-05-17Degree:MasterType:Thesis
Country:ChinaCandidate:S LiuFull Text:PDF
GTID:2231330395460207Subject:Environment and Resources Protection Law
Abstract/Summary:PDF Full Text Request
As a characteristics system of Chinese environmental management, the deadlineadministers has indelible contribution to the prevention and control of water pollution inour country. But "XianGai " has also gradually alienated to "amulet",it makes manyblowdown units in the treatment more unbridled exceeds bid during deadline,it alsocauses a lot of negative effects to environmental protection. Recent years there are morespecific provisions in the system in the field of water pollution prevention andcontrol.This brings the hope of environmental protection work. But at the same time ofjoy,we have to admit, there is still exist many problems and is hard to applicable, this isalso brought new problems to environmental law enforcement, such as the premise ofdeadline governance system application is not clear, and there are dispute on narrowingthe scope of the system application,and although the detailed regulationsprocess ofdeadline governance decisioncan guarantee the environmental protection departmentsnot issued a command at random,but it is obviously too trival to cause administrativeefficiency low and power abuse in decide and controling of the concrete implementationprocess, and blowdown unit can’t accomplish the task within the time limit, etcThis paper, from the basic theory of deadline governance system, focused onresearching the problems of the system in water pollution prevention field. From theangle of clearing premise and solve dispute on applicable scope, exploreing thereasonable simple procedure,introducing instead of performance system to completethe task and rich deadline governance system, strengthing legal responsibilities ofenvironmental protection department and the blowdown units to providecountermeasures to break the problems in the course of execution.
Keywords/Search Tags:Deadline Governance, Applicable premise, Applicable procedures, Insteadof performance, Legal responsibility
PDF Full Text Request
Related items