Research On The Optimization Of Schedule And Resources For Heavy Rod Drawing Machine Overhaul

Posted on:2013-10-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhouFull Text:PDF
GTID:2232330362467438Subject:Project management
Abstract/Summary:PDF Full Text Request
As global economic integration of the sustainable development of the increasinglyfierce market competition, the overhaul project of the traditional industry system is a modeof production of involving a wide range of knowledge, the technological degree ofdifficulty is great, need to invest the resources, such as a large amount of manpower,financial resources, material resources, time, etc. How to improve the level of management,accelerate the progress of equipment overhaul, has been a problem concerned by theproject manager.Base on Wuxi Prysmian Cables Factory heavy rod drawing machine overhaul. Thisessay talks about basic concepts and Internet plan technology of project management,project time WBS in the management theory and possible advantage and disadvantagesbetween Internet plan technology analysis and traditional meaning on Gantt chart. It thenintroduces the development of project management software. In fact, it could be elaboratedfrom three aspects:(1)Design of progress plan:in order to ensure solidfoundation, the aspect of duration, resources, and project requirements is important as thecritical success factor. Using program evaluation and review technique to design the initial plan.(2) Improvement of project implementation:based on Internet plan technology theory forthe purpose of improvised the initial project implementation progress.(3) Optimization ofschedule and resources: based on the project schedule situation to optimize and monitor,control the project implementation. Making proper alignment and renewal within the planscope and the actual happenings.
Keywords/Search Tags:project management, overhaul, project schedule control, Resource optimization
PDF Full Text Request
Related items