Research On Schedule Optimization Management Of D City Lingxiu Manor Project

Posted on:2016-11-08Degree:MasterType:Thesis
Country:ChinaCandidate:X F ZhongFull Text:PDF
GTID:2322330482467224Subject:Project management
Abstract/Summary:PDF Full Text Request
Under the government's policy guidance, D city housing prices began to become stable, D City real estate market is also from the barbaric growth of healthy development. At the same time, the real estate market supply and demand is gradually improving, the price is no longer a rapid rise, the public will not follow suit to buy a house, real estate volume is also a steady rise. For housing prices, the stability of the market environment is conducive to the development of housing prices, while the real estate industry growth rate is also a collective slowdown in the cost of housing prices. Scientific and reasonable project schedule management is the best way to control project cost.The D City Lingxiu manor in the construction of the project for the actual case studies, by WBS, network planning technology and S type curve analysis tools, Lingxiu manor this real estate in build a project to develop a can save investment cost and shorten the duration of the project schedule management plan, designed to help ease the pressure on the development of the owner of the manor project Lingxiu, and as far as possible in the shortest period of time will be high quality commercial housing into the market, thereby reducing operational risks.This paper mainly from the preparation of project schedule, formulation project schedule control three aspects of program and project progress guarantee scheme, project schedule management of Lingxiu manor project. (1) In the preparation of the network plan, this paper adopts industry commonly used network scheduling process, the first target analysis, then according to the characteristics of Lingxiu manor project, work breakdown structure. The third is clearly the work of the logical relationship estimated duration of the work, and draw out the manor project Lingxiu primary network plan. Finally cost time and resources construction measures, can be optimized in the work of network planning project optimization, develop a shorter construction period, lower cost of network plan and determine the critical path. After optimization of the network plan, and the primary network plan to reduce the duration of 50 days, a large reduction in development costs. (2) in Lingxiu manor project progress protection scheme, the control scheme:first clear project schedule control process, secondly to report the progress of the project mainly, the project of dynamic monitoring. Third, to report the progress of the project as the main basis, with S type curve and Gantt chart separately from the whole and part two different angles of and comparison of project schedule deviation and finally, according to the project schedule deviation develop project schedule improvement program. (3) in the project schedule protection scheme, this paper mainly from the four aspects of performance appraisal management, team building, organizational communication, resource management and integrated management describes the project schedule protection scheme, and the combination of theory and practice from the point of view, aiming at the four aspects are put forward, the corresponding optimization scheme.
Keywords/Search Tags:Project Schedule Management, Network Planning, Project Schedule Control, Project Schedule
PDF Full Text Request
Related items