Font Size: a A A

Gas Heat And Power Plant Heating Peaking Operation Optimization

Posted on:2013-04-13Degree:MasterType:Thesis
Country:ChinaCandidate:H WuFull Text:PDF
GTID:2232330374464826Subject:Power Engineering
Abstract/Summary:PDF Full Text Request
Beijing, striving to achieve "Humanistic Beijing","Scientific and Technical Beijing" and "Green Beijing", is necessary to optimize the energy facilities distribution, speed Energy restructuring, perfect energy system-mechanic organization, provide strongly energy guarantee. Combined gas-steam turbine is principal in energy supply pipeline and guarantee system as its higher thermal efficiency, more flexibility and less pollutant discharge.Combined gas-steam turbine is just at the early stage in China. Something about technical design and algorithm analysis are still uncontrolled. The thesis is mainly study the relationship between thermal and power for Beijing Taiyanggong Gas-Fired Thermal Generation, build theory model with its really operational dates,After research。Application proportion method and enthalpy method and then draw up the "thermal-power" line of "one GT for one ST" and "two GTs for one ST" operational model. It will be more reasonable, and economical for power grid enterprises and heat enterprises to make a dispatch. To achieve the desired effect.
Keywords/Search Tags:Gas steam combined cycle unit, Heating, Electricity generation, Powercurve, thermal-power line dispatch
PDF Full Text Request
Related items