Due to rapid economic development in Haiyang city, Especially in economically developed area of the nuclear power industry base, the existing substation cannot meet the load of industrial base, need to build110kV power transformer engineering. Combining with study in the general requirements of the feasibility, priorities and transformation project of the feasibility study report of the requirements are analyzed and studied, combined with the practical situation of the grid Haiyang proposed110kV power transformer engineering feasibility study report of the content and requirements.In this paper, the grid system analysis of the current situation, in the load forecast and field exploration, and on the basis of the deep analysis of the study of110kV transformer engineering typical design, through a variety of solutions of110kV contrast a lattice of project feasibility study and design transformation.Through the exploration, the completion of the transformer substation of location, press into the system solutions, the scale of development and system communication solution, and the selection of equipment and the substation construction layout. Completed the path choice of transmission lines, the tower, wire and cable selection, determine the foundation of the tower type, According to the scale of development and amount, make the project investment estimation, and investment analysis, makes the feasibility study report to the depth of the preliminary design, that the engineering construction is the necessary, and in technology is feasible, in economically rational conclusion.Substation and110kV lines path has obtained the local government departments of the competent department of reply, ensure the feasibility of the design plan.At present the project preliminary design already for provincial company approved, into the specific design, construction stage, and the realization of the practical value and report engineering value to solve the actual problem in the work of the specific.And110kV Liuge power transformer engineering related,110kV Wangshi power station of the feasibility research and analysis in the report to determine the specific solutions together.
Keywords/Search Tags:110kV transmission and substation project, design, feasibility
PDF Full Text Request
Related items