| Spare parts management is judicious, will directly affect the normal operation ofthe enterprise. In the electric power system, he not only relates to the cost of operationof the business, and enterprise safety production management closely linked to theinternal management of enterprises is an essential aspect. If improper spare partsmanagement, equipment not immediately available when needed spare parts, will have acertain impact on enterprises and the production and life of the people. Sparemanagement information system based on the Internet of things" article could very wellsolve electric power companies in this type of problem in the unused parts managementto improve spare parts use and maintenance efficiency.Jurisdiction of Chengdu power transformation operation and management of thecurrent large number of substations, geographical dispersion and substation, all realizedunmanned substation. Spare parts management processes, how timely, reliable access tospare parts for substations numbers and quality, have become a power transformationoperation management is highly concerned with the issue. For more efficientmanagement of spare parts spare parts, improve productivity, reduce the cost of human,material, scientific and rational combination of current Internet technologies to designspare parts management system, through the new spare parts management system, is agood way to achieve the common spare parts management. Staff able to insubstantialparts management systems, real-time browsing and access to spare parts information,and track in real-time, while also authorizing Chengdu power transformation operationmanagement Information management to integrate management information. Chengdupower transformation operation, the system access management the internal local areanetwork, and spare parts management systems has certified interfaces to facilitate spareparts system function extension.Starting from the day-to-day work of the power company, and spare partsmanagement system based on Internet of Things, the system uses B/S structure, defectsof the traditional spare parts management system, analyzing the domestic andinternational research the status qua, in the understanding and analysis of the demand for spare parts management system requirements, use of basic computer theory and ASPprogramming language technology, combined with the idea of object-orientedprogramming, a spare parts management system under the Windows platform, thesystem can be used Electric Power Bureau, spare parts management. As spare partsmanagement system based on B/S three-tier Web service architecture model, thedatabase uses SQL Service2005. |