Municipal Engineering Cost Control And Management Of Project Manager

Posted on:2013-09-08Degree:MasterType:Thesis
Country:ChinaCandidate:J Y LiuFull Text:PDF
GTID:2249330374476693Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Now our city’s new project has become less and less, and the modification or repair and municipal engineering but because of the need of city development is gradually increasing, and the municipal engineering construction environment is complex and changeful. Previously appointed directly by the government of municipal engineering is now also used as a commodity into the market. Construction enterprises through bidding by LAN project profit space is very limited, in the competitive market environment, the construction enterprises to based on the municipal engineering, and to improve enterprise beneficial result, the key is how to effectively guarantee the quality of the premise, to control their own cost.The construction of municipal engineering projects and other projects in many unique. One of, municipal engineering involved in the professional of many types, including roads, bridges, culverts, drainage, lighting, electrical, power, green and many other projects, the need to cross the industry across professional coordination. Secondly, time tight, municipal engineering are a lot of reconstruction engineering, emergency project completed and put into use, the requirements as soon as possible. Third, municipal engineering are mostly old engineering renovation and new construction at the same time, face a lot of demolition, land acquisition or covering problem. Fourth, municipal engineering involves the road widening, not interrupted traffic in construction. How to control the cost in the case of this paper is to study the subject.The author combines personal participation in Shenzhen Beihuan Avenue reconstruction project Avenue reconstruction project experience, at the same time with the relevant theoretical knowledge, emphasizing on construction technical level, discuss how to pass effective technical and management measures to control municipal project cost.In this paper, the author through the analysis of examples of municipal engineering construction cost ascendant reason, its reason basically has the labor cost material cost rise substantially; such as various measures costs, safe and civilized construction costs, management fees, fees for temporary facilities. With the social development and practical engineering requirement, these costs are increasing, they also lead to the rise in the cost of the important reasons for municipal engineering. Finally, material, technology and the concept of constantly updated, they improve engineering industry development at the same time, also accelerated the municipal engineering cost.The author then analyses the current cost control and management problems, cost control, is the enterprise establishs beforehand according to certain period cost management objectives, from cost control main body in its purview, expend in production occurred previously and the process of cost control, on a variety of factors that affect cost and condition to adopt a series of prevention and control measures to ensure the implementation of cost management objectives, management behavior. Now the construction enterprise in the cost control on the lack of cost control management mechanism, the lack of awareness of cost control, construction scheme to apply more generally, the whole process of cost control capability is not strong; in the cost management the lack of cost planning and budgeting system in advance, the construction cost management is ineffective, ignore the " cost of quality" and the" cost of management", to new materials, new technology and new concept of sensitivity is too low.Then, the author based on a case from amplifying the system of cost control, reasonable planning and construction organization, strengthen the construction site management in three aspects the paper discusses how to carry out cost control.Finally, the author separately to the project manager in the construction project in the core of the occupation, emphatically expounded and emphasizes the project manager in a municipal engineering of unique importance, elaborated the project manager should have and the quality requirements.
Keywords/Search Tags:Municipal Engineering, cost control, technical measures, optimization, Project Manager
PDF Full Text Request
Related items