| Currently, the demand for mobile communications customers from traditionalvoice, SMS class business needs to the Web browser, changes in demand for mobileInternet blog, instant messaging, video, games and entertainment, which requiresmobile operators from traditional communication service providers to provideintegrated information service supplier changes for user data flow business needs toprovide faster access speed and greater business stability. Industry restructuring led toa new pattern of the competition, the fierce competition of the new competition in themarket environment network quality as the core enterprise strength, network qualityhomogenization trend will become more evident, continued to maintain a leadingedge network quality are facing unprecedented pressure.The face of the ever-changing customer needs and evolving competitiveenvironment, how to enhance the level of quality and service capabilities of thenetwork, and how to improve customer service satisfaction, loyalty and business useviscosity, how to ensure the effectiveness of network optimization and constructioninvestment, has become the issue that China Mobile have to face. College area hasbuilt-up users and traffic density, the demand for data services, and the tidal effect isobvious, the university radio frequency environment is complex, highly sensitivecomplaints is the important and difficult area of network construction andoptimization.Based on the theory of investment project management, this paper research themobile communications network engineering construction investment project incampus of Jilin University, using quantitative analysis method of network problemanalysis, system analysis methods using a combination of qualitative and quantitativeanalysis of the project investment returns. In this paper, we research mobile communication network construction projectsin campus area through a combination of the principles of analysis and the practicalapplication. Business forecasting and modeling, network topology, design methods,and comprehensive discussion of the planning and construction of a wirelesscommunications network based on the C-RAN architecture and distributed basestation. And the underlying network according to the research process and theimplementation of the construction, the final combination of practical engineeringtool simulation and verification planning results prove that the distributed base stationcompared to the traditional way of more complex scenes campus class applies tomobile communications network coverage.This article explores the scientific planning and careful preparation, using avariety of ways to drop this efficiency, carefully organized and implemented theimplementation Campus area network can ultimately enhance the quality and userperception. Worked out at the same time integrated construction solutions for mobilecommunications network under a set of complex scenes, the application to go to themobile communication network construction in the province, and corporatecost-effective operations. |