| In recent years, with the development of national economy and the increasing number and scale of the refinery construction projects, it is conducive to the environment to improve the existing flare stack system, especially to eliminate the flare to end the pollution.The process of the construction of the risk management and the typical methods in the different stages is introduced based on the theory of the risk and the risk management. With the combination of the theory and the reality, the risk management of the demolition and renovation of the Yong Ping refinery is analyzed for the construction projects of the refinery by applying the risk management principle and methods. The paper focuses on the risk identification and the assessment. That the dynamic risk management consists of identification, assessment, response and the control is proposed.This study can provide some experience for the construction of the enterprise and help them with the risk management in order to enhance the management of the projects of the refining enterprise. |