The Study Of Measure Project’s Cost Forecasting And Controlling

Posted on:2013-11-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y P WangFull Text:PDF
GTID:2252330392460041Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
From2003,The list of quotations have changed the list price model and transitedto fixed pricing in China, it have been fundamental changes in the valuation..In past,the construction contracting companies who bid the program do not give muchthought to the project costs of engineering measures, the cost of this part will beaccording to the actual adjustment, the construction units do not bear this part of therisk. The implementation of list pricing caused construction enterprises have to bearthe risk of measures to project costs, it is enterprises’ idea, and shall not be changedfreely.In this paper, it is gonging to discuss how to predict measure project’ costseffectively and manage inventory valuation in mode.(1)First, using the BP neural network builds appropriate measures’ project costforecasting model, and then based on the CRC project’ data to propose measures’project cost prediction method, Contrasted with the stepwise regression modelanalysis, the result means which based on BP network prediction model has betterstability and accuracy.(2) Target management measures project experience in the field of engineeringand technical personnel combined with the analytic hierarchy process (AHP) methodto determine the specific measures the proportion of the project in total measuresproject costs, and thus determine the specific measures the cost of the projectobjectives, project measures in according to the target cost control.(3) Do technical and economic construction technology program, multi-attributeselection, to determine the optimal solution. Measures project "construction design"part of the construction unit, construction unit according to their technical capacity toset a specific construction program, the costs of different construction schemes, westudy how to select the appropriate program, and thus control costs in advance. Thetarget cost is determined, the Hall of thinking model measures projects and programsto develop the use of technical and economic analysis, multi-attribute analysis ofprojects and programs in the specific measures selected, selecting the optimal solutionto meet the target cost.(4) This paper introduces the application of the measure project cost’s forecastingand control methods through practical application.
Keywords/Search Tags:Measures project cost, Forecasts, The BP neural network, Model ofmanagement by objectives, AHP
PDF Full Text Request
Related items