Analysis Of Safety Management In Nuclear Power Project Construction Under Mode Of General Contract

Posted on:2013-09-16Degree:MasterType:Thesis
Country:ChinaCandidate:W SuFull Text:PDF
GTID:2252330428961000Subject:Safety engineering
Abstract/Summary:PDF Full Text Request
Nuclear power construction of china is moving forward at highspeed, the current builded nuclear power projects inChina up to12. This rapidpace of nuclear power development is bound to bring unprecedentedchallenges and difficulties to the safety management of nuclear powerconstruction, China is now eagerly to need to establish a safety managementsystem and standards to guide and regulate the safety management of nuclearpower construction.By introducing and analysising foreign and domestic current nuclear powerconstruction management, this article puts forward that China should developand expand domestic nuclear power engineering general contracting company,and actively promote the EPC nuclear power construction mode. And thesame time,combining with the actual situation of safety management inSanmen nuclear power project, by introducing the ideas and practices,enumerates and analyses the advantages of safety management in Sanmennuclear power project under mode of general contract, sums up theshortcoming and deficiency of safety management under mode of generalcontract; by analyzing the advantages of safety management in Sanmennuclear power project under mode of general contract, concludes that themode of general contract is a effective way to improve safety management andsafety performance of nuclear power project; the same time, proposesconstructive ideas which can remedy the shortcoming and deficiency of safetymanagement in nuclear power project, in order to further improve the safetymanagement in nuclear power project under mode of general contract.
Keywords/Search Tags:Mode of general contract, Construction of nuclear power project, Sanmen nuclear power project, Safety management
PDF Full Text Request
Related items