Analysis And Design Of MIS (Management Information System)on Nuclear Power Construction Of SD

Posted on:2014-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y B LiFull Text:PDF
GTID:2252330425461716Subject:Business administration
Abstract/Summary:PDF Full Text Request
In view of the characters of higher requirement, multi-interface, multi-system, larger scale of construction, huge investment, long-term construction duration, higher risky factors and complicated coordination status of nuclear power construction project, the application of Management Information System (MIS) plays a significant role on aspects of project management improvement, optimization of information system and procedure, acceleration of information transmission, accumulation of various information and experiences, scientific analysis and judgment, which results in an improvement of work efficiency and work quality, a reduction of construction duration and investment, as well as the improvement of core competence of construction units, etc, which are also the points that decision makers have to face and consider. MIS for nuclear power construction can be granted as an epitome of nuclear power construction model, which focus on the targets of improving operation efficiency and management level so as to realize the targets of integrative information management of nuclear power construction, integral document controlling model, joint information share for each unit, procedure optimization, as well as management cost reduction, so as to prompt an orderly management process of nuclear power construction.In view of the characters and difficulties of the nuclear power construction, the request analysis and general outline designing on MIS have been conducted in the thesis via the application of modern management technology rectification procedure and IT technology, resulting in the establishment of MIS (Management Information System) which comprises of sub-systems, such as safety management, construction management, schedule management and quality assurance, etc, which have facilitated a smooth control on aspects in terms of quality, safety and schedule of construction, which results in a joint information sharing for contractors, an accelerating transmission of information, a reduction of information communication errors, and an improvement of company’s engineering management level for nuclear projects as well as its core competitiveness. The research outcome can be adopted as the blueprint for the other nuclear power projects under PEC management. The research outcome can also be taken as reference for other construction projects, which plays a significant role of pushing forward R&D, popularization and application of MIS. The research of thesis focus on two aspects:One is to realize the integral solution plan for the informationization of nuclear power construction, on which multiple management models that cover the entire CI&BOP construction duration are co-existed. To realize the integrative management platform, database platform and web platform which are co-shared by each construction party so as to adapt to the operation management model which is jointly managed by them; The second is to realize data transmission between information systems, re-organization of work procedure, shortened duration of information transmission and reduced repetitive works via data interface and by adoption of E-Signature technology and re-organization theory of work procedure so as to reach the targets of reduction of management cost and improvement of work efficiency.
Keywords/Search Tags:Nuclear power project, Project management, MIS (Management Informationsystem), Management model, E-signature (Electronic signature)
PDF Full Text Request
Related items