| The computer has become an important tool for human beings. As the soul of thecomputer, the development of software technology in the application of computer play adecisive role, has infiltrated into all sectors of society, showing a system increasinglylarge scale, complex degree is more and more high, the development cycle is becomingshorter and shorter, more and more high-quality products characteristics. However,affected by various factors, software technology in productivity, product quality, costand performance in many aspects such as showing behind the hardware technologydevelopment trend, become one of the key factors to restrict the usage of computer.As the third party software evaluation mechanism, to solve these problems, toimprove the software testing work, improve the efficiency of software and computer useis particularly important.In this paper, a large number of reference literatures, around the databaseconnection pool, authentication of the user interface, function tree traversal recursion,document generation, system implementation results and other aspects of the test casegeneration and management of. Analysis of UML activity diagram model test, proposedone kind based on the UML activity diagram model of test case generation method;analysis of the current market, the test management tool in the document generation oflimitations, to Liaoning software evaluation center software testing management toolQuality Center introduced. Extended development of the existing test managementsystem (Quality Center) to quickly generate test documentation to meet therequirements can be customized.This article focuses on the organization, database E-R diagram and databasestructure of fast test cases generation method, flow around the object recognitionmodule, cycle recognition module, concurrent identification module realizationdescribes the activity diagram concurrent identification module, around the testdocument generation system, target, main technical features design software componenttechnology, introduced the system development, around the database connection pool,authentication of the user interface, function tree traversal recursion, document generation, system implementation results and introduces the software realization.The significance of this study lies in the combination of the third party evaluationmechanism to the actual business needs, explore a rapid generation of test cases, theeffective management method of test case. In order to reduce the workload of softwaretest case design, improved software defect discovery rate, improve the platform testingservice efficiency, guarantee the quality of software testing. After a year in the testproject in the practice of continuous improvement, the software has released2.6version,project data, phase90%work can be computed in a few minutes, greatly improves theproduction efficiency, reduces the cost, while avoiding the artificial nuclear data is notaccurate, effective strengthen the test outcome of the delivery capacity and quality. |