| Various enterprises of the world paid attention to quality management since itexisted, so far, the quality management had developed many theories and most are usedextensively by every enterprise of the world, even some enterprises basis on the theoriesof the quality management, they created new quality management system,these newsystems are fit for these enterprises themselves. In fact, no matter which kind ofindustry or enterprise, they should create their own quality management so that theyhave a better development. All these need enterprises link the theoretical knowledge ofquality management and the current situation of the enterprises, they can get moreobvious competition advantage by this way.China Sinopec Guangzhou Branch catalytic reforming the joint plant constructionproject is a complex system: multi-tenders, multi-subproject, multi-specialty, multi-levelmanagement and the factors of outer control, all these need the monolithic coordinationand control, so the quality management of this item should have a more higher require.According to the trend of hodiernal development, there will be more complexengineering systems to follow Chinese economical development in the future.From the example of the Guangzhou Sinope, we can see that the effectualmanagement is the very important part in the whole item engineering. So the thesis willmake the quality management of China Sinope catalytic reforming the joint plantconstruction as the sample, make a deep study and try the best to be the excellentexample about the quality management of the construction item in the future. My thesisincludes the following six parts. The first part is introduction, it introduces the studybackground, significance,study methods and the text innovation of the thesis. Thesecond part is literature review, the part mainly introduces the definition of qualitymanagement, the current research situation at home and abroad, and the research trendin the future. The third part is catalytic reforming the joint plant construction projectquality plan, about the catalytic reforming the joint project, the part makes acorresponding introduction, analysis the design, purchase,drive and control plan of theproject acceptance quality of the catalytic reforming the joint project. The forth part is the catalytic reforming the joint plant construction project quality guarantee system. Thefifth part is the catalytic reforming the joint plant construction project quality control,the part makes a analysis about control quality, the analysis includes project design,purchase, construction and change management. The last part is the summary of thethesis. |