Research Of The Standardized Administration About Safety Production On Overhaul

Posted on:2016-05-25Degree:MasterType:Thesis
Country:ChinaCandidate:M WangFull Text:PDF
GTID:2272330482465423Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Nowdays, with the further advance of State Grid, the standardized administration of safety production is faced with new situations and tasks on the overhaul mode. However, the integration of substation operations is the inevitable requirement and means to realize the goal. As basic elements of electric power enterprises, the team is the direct carrier of production, is an important part of production operation and management. Therefore, it is the primary task to solve and handle the new problems and new situations in the team.Under the management of Shandong power grid, the overhaul system has been built. Therefore, the production management pattern of Taian Power Supply Company changes obviously, especially in personnel position, business scope and the working interface. In order to adapt to the change, the overhaul laboratory of the company innovated management mode and put forward the standardized administration of safety production in the overhaul mode. The measure is closely around the "standardization" management system of Shandong electric power Group Company. The management mode is starting with the job site. It includes four aspects. In the meantime it involves technology and the information, the state analysis of safety instrument, the administration of productive field, the level-to-level administration of risk analysis, the administration of two tickets for the performance, the detailed working, the strict end, the training manual of job site, etc.The aim of the standardized administration about safety sroduction on overhaul is to improve the level of equipments’normal situation and the ratio of equipments’ defect. Then the the safely and steady operation of power network can be kept on, and it wins "the battle of safety". At the same time, we could improve the safety standard, and construct the whole instruct, and improve the efficiency, so that, the overhaul could be completed successfully. With the finish of overhaul, the pattern of production and management in Taian Power Grid Co changed to "one brunch one company" from two layer management pattern before. In order to make the work to go on safely and detail the process of overhaul, we must standardize the management of production in the pattern of overhaul.The overhaul laboratory applied the standardized management to the spring and autumn examination. This made the work personnel in the field and the working process standardized. It also improved the quality of the site inspection. In 2012, with the implementation, the company broke through the safety production of 5000 days and the elimination of defects was improved obviously year-on-year. At the same time, the benchmarking score of the team increased significantly. The overhaul laboratory won the inspection team’s good praise in this year.The article is to reformation design Hong Miao transformer substation on the basis of the standardized administration in safety production. The preliminary of the overhaul system changed the management mode and made on-site safety production management innovated; it is the key of standardized management to pay special attention to the executive implement with the establishment of standardized management system.
Keywords/Search Tags:overhaul, safety production, standardization, benchmarking of the team
PDF Full Text Request
Related items