The Feasibility Study On Gucheng Branch Line Attached The HD Highway |
Posted on:2017-05-01 | Degree:Master | Type:Thesis |
Country:China | Candidate:J Li | Full Text:PDF |
GTID:2272330503484815 | Subject:Architecture and civil engineering |
Abstract/Summary: | PDF Full Text Request |
The project has based on the traffic program planning about modernizing roads and waterway of Bo Hai coastal region(Beijing-Tianjin-Hebei) and focused on the route plan in relation to hengshui-dezhou highway to hebei and shandong provincial boundary combining the Hebei and Shandong highway network planning. It gave initial research to the feasibility of the project stretching to the north by analyzing regional economy and transportation condition.It has forecasting the traffic volume of project based on regional traffic impact and economic material and determined the main control point of the route by analyzing the primary factor influencing the route of project. It focused on route scheme comparison and selection combining the position and role of the project in the highway network.It has given the suggestion we should carry out early research about the road segment stretching to the north as soon as possible in order to guarantee route position and final position adapting present situation and recent traffic demands and long-term traffic development and lay the foundation for realizing the channel function of the route. |
Keywords/Search Tags: | Route plan, Feasibility, Traffic volume, Analyzing, Comparison and selection |
PDF Full Text Request |
Related items |