Font Size: a A A

Research And Analysis Of EMS Export International Express Management System In Longyan City

Posted on:2017-01-03Degree:MasterType:Thesis
Country:ChinaCandidate:R LuoFull Text:PDF
GTID:2278330488950368Subject:Software engineering
Abstract/Summary:
Today, electronic business developed rapidly, accelerate the process of international trade, the international demand for customer delivery have become increasingly prominent. At the same time the customer service quality requirements for the courier company is also getting higher and higher, but today’s EMS export international express delivery business is still in a relatively backward level, and the international courier company’s information technology level is higher than the domestic enterprise, domestic express delivery companies to bring great pressure to survive, so to improve the competitiveness of the market, standardized management has been an urgent need for postal courier logistics company to improve the level of information technology and the internet.This paper introduces in longyan EMS international express export management system of project background, this paper analysis the project research significance, and compared and the research status of similar projects at home and abroad, to determine the main content of this thesis study and work,The principle and method of software engineering are used throughout the whole process of system design.In the course of business analysis,this paper makes a detailed study and Analysis on the business of the international express delivery management system of Longyan EMS, and improves the old process.In functional analysis, This article carries on the functional analysis to this system, mainly aims at the system’s various business, the role, the data as well as each function module. In data analysis, using class diagram and E-R diagram, further refine the system function module, the data and information relating to analysis the modules.Thesis finally summarizes the research and analysis of the work done, and the further work was looking forward to the last part of this paper, summarizes the thesis involved in related work, and put forward the deficiencies and further work plan.
Keywords/Search Tags:EMS, International express delivery, Functional Modeling, Database Modelling
Related items