A Study On Foreign Investor Financial Risk Management Of Mongolian BOT Project

Posted on:2017-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:N E Q Q G WuFull Text:PDF
GTID:2279330485960392Subject:Engineering and project management
Abstract/Summary:PDF Full Text Request
In recent years, Mongolia needs expanding infrastructure construction, infrastructure investment and financing system of traditional rely too much on about the government’s financial capital, capital utilization ratio is lower, under construction and the operational efficiency of the project, the lack of competition consciousness, caused the overall infrastructure development serious lag behind the development of social economy, unable to provide social need of public products and public services. BOT financing mode as a kind of special rights agreement privatization, effectively alleviate the Mongolia financial fund shortage and big infrastructure investment demand contradiction. With the related provisions of BOT project financing in Mongolia, but the Mongolian foreign investment in BOT project financing risk is still can not be ignored. Therefore, this paper takes the Mongolian foreign BOT project financing risk management as the research subject, first of all, by the method of literature reading, international BOT project financing risk management research status at home and abroad were reviewed, in reference to existing research results, on the basis of combing the international BOT project financing risk management related theory, as the theoretical basis of this article research; Then, using theoretical analysis, the Mongolian foreign BOT project financing risk identification, risk analysis and risk management strategy for system analysis, summary of the Mongolian foreign BOT project risks, Mongolian foreign BOT project financing risk analysis method is put forward, and corresponding Mongolia are put forward from the Angle of Mongolia and foreign BOT project financing risk countermeasures; Finally to ulan bator 5 power plant 450 mw cogeneration project as an example, to the ulan bator 5 power plant 450 mw cogeneration project financing structure, financing characteristics were analyzed, and summarizes the ulan bator 5 power plant 450 mw cogeneration project of the main risk, summarizes the ulan bator 5 power plant 450 mw cogeneration project financing risk measures, to Mongolia other foreign investment in BOT project financing risk management has important practical guiding significance.
Keywords/Search Tags:Mongolia, Foreign investors, BOT project financing, Risk management
PDF Full Text Request
Related items