Font Size: a A A

Study On Construction Risk Management Based On FIDIC Conditions Of Contract Forconstruction Of Construction Project

Posted on:2016-10-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y Z HuFull Text:PDF
GTID:2309330461491716Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
In the 21 st century under the backdrop of economic integration, more and more Chinese construction company, the international engineering object of construction production, in the meantime, there are also many international construction companies through the international public bidding in China construction engineering projects, China’s construction market has tended to be internationalization.Vicious rivalry is stinging, but the intestine construction market contractors for construction control of the time is not enough standard, consciousness of risk is not mightiness, there are a lot about the distribution of the all kinds of construction risk liability fuzzy area.Construction of the item construction procedure is a complicated and irreversible one-time system construction procedure, construction engineering object risk exists in the whole procedure of construction engineering item construction.There are plenty of uncertainty elements in the construction item construction process including people, equipment, materials, technology, environment, etc.The world economic integration makes with the world and China state construction engineering market and international market integration.In the meantime, the rapidly changing international environment brings to the construction of the object construction control more, such as economy, politics, environmental uncertainty, so the more risk, risk of loss.Delve into explore, therefore, the project construction risk control and actively seek to avoid using or transfer in the process of construction engineering project construction control risk of the loss of more scientific and effective ways and means, to aggrandize the financial benefits of the construction has the positive significance, the contractor is also very urgent to guide the enterprise risk management of construction.Construction of FIDIC contract demonstration text is the current global integration engineering project contract demonstration text, its contract clause is rigorous and reasonable, fair and just, responsibilities clear, simple to apply. From the Contractor’s interests and perspectives,this thesis adopts the extenics risk evaluation method and combining the dynamic tracing control principle, the construction of FIDIC contract conditions of the contractor for the construction of risk management.First the divergent tree method in extenics theory associated with points chain method integrated into tree method, to analysis of the construction of FIDIC contract text demonstration about the contractor’s construction risk factors, and establish the extension identification hierarchical model.Then, using the extension evaluation model in extenics innovation method to establish the underlying risk factors evaluation model construction, synthetical and extension layers of construction venture identification model, utilizing the analytic hierarchy theory in the model analysis of the relative weight of each venture and to calculate.Finally, combining with the actual case by using the principle of the dynamic tracking control for contractors construction whole process of construction risk factors for dynamic tracking control, and to verify this model come to the conclusion.Better for construction contractors to provide reference for construction risk management.
Keywords/Search Tags:The FIDIC conditions of contract for construction, contractor, construction venture administration, extension evaluation, dynamic tracking control
PDF Full Text Request
Related items