Font Size: a A A

Research On The Risk Management Of Buliangou Coal Preparation Plant EPC Project

Posted on:2013-10-01Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhangFull Text:PDF
GTID:2309330467476304Subject:Business administration
Abstract/Summary:PDF Full Text Request
First of all, this paper briefly expounds the nonunion ditch coal preparation plant of general contracting project background, puts forward the necessity of research on project risk. Secondly, a systematic overview of project risk management theory, the project risk identification, analysis, response, controlling, monitoring and other stages were discussed. Again, not even ditch coal preparation plant are introduced in general contract project summary, organization, scheduling and management objectives. Then, this paper through the investigation, expert interview and phase analysis, and reference to the relevant provision of FIDIC and related study results, the general contract project risk identification; by constructing risk evaluation model, using the AHP method to not even ditch coal preparation plant of general contracting project common risk factors were analyzed, according to combination weight size on the risk factors of importance ranking and classification management; from risk aversion, risk transfer, risk mitigation, risk acceptance, risk monitoring and so on several aspects to sum up a set of perfect risk response strategy; from contractor angle, Putting forward the risk controlling countermeasures in the list of important risk factors. This paper to improve the general contractor risk management awareness and management level have certain positive role.This article from the domestic coal industry coal preparation plant construction present situation, through the project risk management theory and method, use project risk management theory, for not even ditch coal preparation plant general contract construction project risk identification, analysis, and puts forward the corresponding measures for risk prevention. Pointed out to not even ditch coal preparation plant of general contracting project conducted by the risk identification, risk analysis, risk response and risk controlling is not only suitable for coal mine construction project, and the method has wide applicability, and can be applied to general contracting construction projects.
Keywords/Search Tags:risk management, risk identification, risk response, risk controlling
PDF Full Text Request
Related items