The Management Control For The Completed Final Estimate Audit Of Wu Qi Petroleum Production’s Xue Cha Petroleum Surface Engineering Project

Posted on:2015-04-22Degree:MasterType:Thesis
Country:ChinaCandidate:X FengFull Text:PDF
GTID:2309330467488275Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of society, petroleum has become a key branch of the economy. Petroleum Surface engineering project has a great influence on petroleum production and plays an important part on construction investment of petroleum engineering. Because of the surface engineering project’sone-short investment, complicatedEngineering, multitudinous construction link, influencing oil engineering investment and raising the cost of oil production.Audit as an important method to control project cost at completion of the project has important applications in the completion settlement. It is not only the important stage to determine the project cost, but also the gist of the preparation of making final settlement of account and evaluatingthe new fixed assets value. Therefore, to strengthen settlement of the project audit system is a very effective way to reasonably control the project cost.This paper take Wu Qi Petroleum Production’s Xue Cha Petroleum Surface Engineering projectas an example of the completion settlement project audit management system. Through the theory of the audits explain the completion settlement audit supervision systems’ goal, necessity, practicalsignificance and the final Estimate Audit’s current situation of domestic and foreign, meanwhilecombining the project’s survey and problems. On this basis, embracingthe project’s audit supervision function and process optimization to explain and puts forward themeasures and strategies of audit management optimization.Oil has important strategic and economic significance for the development of society. Petroleum surface engineering, as an important part of an oil field construction, occupies an important position in petroleum engineering construction investment. Audit as an important method to control project cost has important applications in the settlement of the completion of the project.In this paper, taking Wu Qi Petroleum Production’s Xue Cha Petroleum Surface Engineering project as an example of the Project Completion Audit Management Control settlement, the author sets forth the target for completion of the settlement of audit supervision system, according to the situation, priorities and methods described, combined with the actual analysis of Wu Qi Petroleum Production’s Xue Cha area, on the basis of project completion settlement auditing theory. As a result of paying less attention to the completion of settlement audit preparatory work and a poor quality of the project budget, much pressure was caused to Wu Qi Petroleum Production’s Xue Cha Petroleum Surface Engineering project. On the other hand, the unreasonable internal audit agency, low quality of employees, unclear auditing standards as well as incomprehensive controlling means bring risks to the completion of the settlement of audit quality controlling. To solve these problems, specific measures, such as improving the management and quality control audit units and personnel qualification examination, specifying Audit construction contract, strengthening supervision and management of the process of monitoring and evaluation of internal audit mechanisms, must be taken.
Keywords/Search Tags:Petroleum surface engineering, Completion of final audit, ManagementOptimization
PDF Full Text Request
Related items