Compliance Process Design For The Final Acceptance Of Surface Engineering Construction Projects Of Oil And Natural Gas Fields From Jilin Oilfield Corporation

Posted on:2012-07-13Degree:MasterType:Thesis
Country:ChinaCandidate:X N LiangFull Text:PDF
GTID:2189330332497310Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Based on the oil and gas fields of Jilin Oilfield Company ground for acceptance of project construction process re-engineering, one of oil and gas company acceptance of project construction management of the status and necessity. Project complexity, project contents, in the areas of Canton; project oil and gas field services, schedule progress of the tight, high quality, duration and quality of the relationship between treatment difficult; oil and gas field surface construction features of the project decided to completion and acceptance of management problems, particularly in project completion production time to focus on the end of construction works as soon as possible post-settlement requires acceptance, resulting in final acceptance more difficult; Construction unit management institutions are not perfect, and management personnel less weak management awareness; design units, construction units, non-destructive testing unit, supervision units, quality supervision departments and construction units overlook the completion and acceptance of work; works on multi-tail, ending a long time, affecting acceptance process; engineering and design discrepancies entities have occurred, to complete the formalities delayed acceptance; reach completion data delayed impact of records management requirements and final acceptance, the project would account for about 80% of project acceptance; oil and gas fields of special construction projects ground inspection procedures for a long time; management coordination difficult. Taking these proposed process design specifications for final acceptance to meet development needs, improve management efficiency, improve project management level, with good economic and social benefits. Second, the basic framework from the process, the main problems and the need to improve depth analysis on the direction of the final acceptance of the original process. Completion and acceptance of the basic framework of the original process is to meet the conditions for final acceptance of construction project management at different levels, limited by the construction unit organized under the project acceptance. Restrictions on the project pre-acceptance by the construction unit organization, the company completed infrastructure at the organizational acceptance. The original process in the actual operation the main problem is from the small project level; special inspection work is not really into the process management; Participation parties unclear responsibilities, working nodes is not clear; Subject project is simple, the lack of uniform standards, the actual Operating difficulties; limited joint-stock companies on the project, no process-level project, only shares of the company based on manual inspection. Final acceptance of the original direction of process improvement Project management at different levels to continue to strengthen and expand the level; supporting the establishment of Jilin Oilfield Company, a special inspection process; to further clarify the conditions and time of completion and acceptance to make it more operational; clearly the responsibilities of Quality Supervision Unit ; improve the process of completion and acceptance of projects under the restrictions and limits on oil company project processes separately; established stock company-level project to completion and acceptance process, to compensate for the lack of process. Improvement projects will form the corresponding three sets of three levels of completion and acceptance of standardized procedures. Jilin Oilfield Company is a combination of the three oil and gas field construction projects ground to the practical needs of final acceptance, the acceptance from the grading process management point of refinement, clear responsibilities of all parties participating in the construction, clearly from the special inspection for process, especially from the file management point of view the crux of a careful analysis of the final acceptance. Final acceptance is divided into four levels, namely national final acceptance, final acceptance level joint-stock companies, oil company-level completion and acceptance, final acceptance Oilfield Company plant level. By more detailed level, to facilitate management. Final acceptance time more practical. Special acceptance terms more clearly defined who and how to apply for special inspection procedures. Organizational procedures to further sort out the final acceptance. Acceptance of the project-level joint-stock companies, oil companies and oil companies-level acceptance of the project-level acceptance of the project process plant were drawn to highlight the details of the formation of working standard, easy to manage. Fourth, the new process to ensure the smooth implementation of the organization from the program implementation, institutional, technical and financial aspects of the various measures to protect. Organization through the establishment of a sound organizational structure, clear roles and responsibilities of personnel. Leaders attach importance to the construction unit, the final acceptance simultaneously with the construction preparations. Systems by compiling relevant existing national laws and regulations, China's oil and gas business requirements and business management methods, improve oil and gas field surface engineering construction project completion and acceptance management system assembly, and according to China Petroleum and natural gas stock company existing completion and acceptance of the system prepared and Jilin Oilfield Company Oil and Gas Field inspection of project construction land management practices and evaluation system. Technology training through the final acceptance, final acceptance will hand over the technical books and electronic form distributed to relevant units in the hands, clear for the actual completion of Jilin Oilfield Company file format to guide the parties participating in the construction set for completion documents. Construction project files in a specific operation, adhere to the project files simultaneously work with project management principles, is to ensure that the project file data is complete, accurate, complete, systematic and effective measures. In addition, the completion and acceptance of company documents clearly the work of the construction costs of management fees charged for the completion and acceptance of the implementation of the new process provides a reliable funding. Fifth, ensure that the new process from the oil companies implement and improve the management point of completion and acceptance of some suggestions to meet the new requirements of the development of Jilin Oilfield. In summary, completion of oil and gas field surface engineering design process for acceptance of oil and gas field construction project completion and acceptance of land management is an important basic construction management work is an important oil and gas infrastructure one of the procedures is to project a good start, a good start, to close a good finish, an important guarantee for Nice Office and also on the function and quality of the project is to adapt to oil and gas production in the final inspection, and checking. To do this work is to solve the final acceptance of work behind, the final acceptance time low, raising the ground level of construction management an important safeguard.
Keywords/Search Tags:compliance process design, final acceptance, surface engineering construction projects, oil and natural gas fields
PDF Full Text Request
Related items