Font Size: a A A

Research On The Index System Of Two Oriented Of Approval Of Construction Projects

Posted on:2016-05-29Degree:MasterType:Thesis
Country:ChinaCandidate:B B LiuFull Text:PDF
GTID:2309330482969521Subject:Project management
Abstract/Summary:PDF Full Text Request
China’s 17 major meeting, determined and Wuhan cities of Changsha-Zhuzhou-Xiangtan urban agglomeration delineation as "two types of social" experiment, and gives both pioneering policy innovation of the privileges of the testing area.Changsha-Zhuzhou-Xiangtan urban agglomeration with "two-oriented society" experiment as a breakthrough in the near future will enhance the overall quality of various aspects.Building on the physical form of the city to rely first on the implementation of various projects.Then, construction projects can be seen as "two types of social" construction in the field of material forms a basic unit.In "environment-friendly" Community construction under the background of the times, the State has modified or newly launched a series of standards to guide the implementation of specific construction.While government departments in the pilot study, adjusting the administrative examination and approval of construction projects in order to change functions and improve efficiency.But the current domestic construction projects on both types of melt index structure system of examination and approval has not been a scientific research.In this paper, the construction project two model to study the index structure system of examination and approval, first to explore the connotation of the two type of chemical construction projects, the project administrative examination and approval procedures to the current construction project the analysis of existing problems and the causes of,respectively, from the "declaration of material specification to streamline a complete declaration", "creation is responsible for the organization and coordination and oversee window", "system" to set up joint in construction projects in the aspects of both types of examination and approval of process reengineering.Second, take the zhuzhou yunlong demonstration area construction project of type approval for two type of construction project evaluation objects index structure validation of examination and approval, from environmental protection, soil and water conservation, energy conservation, social stability and so on four aspects to the constructionproject of two type approval to build out the reasonable index system,including four criterion layer index and 15 factors index; By fuzzy evaluation method as the two main type of index system of examination and approval of validation method, using the analytic hierarchy process as a method to determine index weight, it is concluded that zhuzhou city yunlong demonstration zone construction project evaluation index system of two type of the examination and approval of environmental protection,water and soil conservation, social stability, energy saving four criterion layer indexes to meet, only need in each index evaluation result to find out "is not in conformity with the" comprehensive value higher index to improve; Finally it is concluded that yunlong district construction project in two type approval index system is feasible.Finally, according to two type of yunlong demonstration zone construction project the results of the evaluation index system of examination and approval, and points out that in the process of project construction and advantages, can for future construction projects in both types of access to provide the corresponding reference in the process of examination and approval. Points out the insufficiencies of its current in theory, at the same time collect yunlong demonstration the plight of the actual operation of the examination and approval of construction projects,and has a good feasibility suggestions and measures are put forward.
Keywords/Search Tags:two-oriented society, construction project approval, indicators of examination and approval
PDF Full Text Request
Related items