Study On DTC In The Supply Contract Of The Power Engineering Equipment

Posted on:2016-02-04Degree:MasterType:Thesis
Country:ChinaCandidate:X M JianFull Text:PDF
GTID:2309330485983262Subject:Project management
Abstract/Summary:PDF Full Text Request
Thermal power project contract management is different from the conventional construction contract management. It involves to many aspects, such as (foreign) project owner, contractor, electric power design institute, China, and materials supply company, logistics and transport unit and so on. In the 1980s, due to the low demand for personalized, more power plants considered is in advance or delivery schedule, equipment put into operation in advance, the faster time to create greater economic benefits. For the thermal power equipment of the economy, the stability of the operation does not do more to consider. TheDongfang Steam turbine company in the 80’s had created a 300N model has reached more than 80 stand. Today, with the intensification of China’s haze, high quality coal and other non renewable power generation with the resource is becoming increasingly scarce, the national development and Reform Commission for thermal power projects approved increasingly stringent.Domestic five major power groups in the face of the country’s strict standards and the sharp decline in the domestic thermal power market, the need for approval of thermal power projects also must pass the national EIA testing, the indicators meet the national requirements of the project to be launched. Can be seen, whether domestic five major power companies or private enterprises in the signing of the purchase contract for the turbine thermal power equipment, not only to meet the delivery time of the equipment, the more attention to the heat consumption, power and other comprehensive economic indicators. Therefore, in the face of the company’s own situation, the thermal power market is shrinking, the contract price is lower, the technical specifications and product quality are higher and higher, the purchase cost is increased, the logistics cost is increased.Through the summary of the contents of the thermal power project contract management, we hope to have some reference for the large equipment enterprises in the contract management of the thermal power project.
Keywords/Search Tags:Equipment supply contract, Lean management Thermal, power engineering, Expert investigation method
PDF Full Text Request
Related items