Font Size: a A A

The Integrative Analyse Of Technology Alteration Of K-specifications Wire Rolling Of Shougang

Posted on:2012-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y SunFull Text:PDF
GTID:2311330512470799Subject:Project management
Abstract/Summary:PDF Full Text Request
With the increasingly fierce of the competition market,the steel market has ushered the unprecedented challenges,wire products is one of the important species of steel products,it is widely used in construction and wire products industry,and which for the huge steel mills to bring economic profits relative.Wire products for greater profit margins become the steel technology projects of the research focus.Based on the technical renovation programs of K-specifications wire production as the research object,using project management theory and methods,separately from the technical feasibility and economic feasibility Angle to project were analysed.This paper mainly USES the function evaluation method to achieve project technology goal,the craft,equipment various technical function of quantitative analysis of before modification,data and after reconstruction projected data of comparison,by collecting large amounts of data,material and investigation of the situation analysis,ensure the project technology advancement,applicability and economy with characteristics;Through detailed data analysis of the project,the financial costs and benefits of recognition,then combines certain prediction method to identify projects,financial expenses and benefit forecast and analysis,find out the feasibility of the project financial.In addition,this paper production technology and product performance reliability of the risks of such technical factor analysis,and to make the risk prevention measures;Meanwhile,combining the current market economic background,industrial structure adjustment of economic risk factors such as made the forecast for after the completion of the project,and the possible existence of economic risk reason is analyzed,in view of the project investment construction and after completing the economic risk formulate corresponding measures,through multiple data contrast and analysis concluded that this project implementation of reform can not only improve the quality of the products,make the product cost,improve the company overall economic efficiency,improve product market competition ability have great role,so the technical modification project of K-specification wire is very necessary.
Keywords/Search Tags:wire rolling, Rolling process, Feasibility Study, Technical analysis, Economic analysis
PDF Full Text Request
Related items