Coal Yard Construction Project Schedule Planning And Control Research In CKKA

Posted on:2015-11-02Degree:MasterType:Thesis
Country:ChinaCandidate:G Q LiuFull Text:PDF
GTID:2311330512471377Subject:Project management
Abstract/Summary:PDF Full Text Request
Nowadays CKKA various imported coal trading company,on the one hand,constantly bigger and stronger individuals,on the other hand,the competition of future trade enterprises of the coal imports,in the final analysis the market and internal management of competition,enhance the management especially for the coal yard management,has become an important factor to import coal trading company successful development.Therefore,the transformation of traditional coal yard lines management concept,the use of advanced project management concepts in view of the coal yard project has important significance to import coal trading company,especially on the import of CKKA coal trading company.China and Mongolia are linked by mountains and rivers,depend on each other,complement each other's location relations in economy and resources.Enter since twenty-first Century,as China overtook Japan to become the world's second largest economy,China's foreign energy dependence is getting higher and higher,and as China's friendly neighbor and abundant mineral resources in Mongolia of China will undoubtedly become one of the preferred source of supply of China's energy input strategy.Long land border in Mongolia and China,as China is one of the main mineral imports from Mongolia coal resources how to pass the border trade logistics system into China gradually become the focus of concern.Based on the summary and analysis of the research status of domestic and international project management theory and the method,using the method of combining theory with practice,data analysis and literature study,deeply studied the problem of schedule plan and control for large-scale projects,discusses in detail the practical application of the process method of project schedule planning and control in engineering in the project.Discusses in detail the application of the related basic theory in the engineering project construction schedule plan,elaborated the schedule planning and implementation of the requirements and measures,using optimization method to the actual and planned progress were compared and examined,the deviation,and the reasons for producing offset is analyzed and studied in detail then,has made the adjustment to the project schedule,in order to improve the effectiveness and accuracy of the project schedule,ensure the completion of the CK port customs surveillance zone of coal yard project master schedule.
Keywords/Search Tags:scheduled plan, PERT
PDF Full Text Request
Related items