Font Size: a A A

Research On Cost Management Of The Reconstruction Project Of Dongqing Road’s Daqing Section

Posted on:2015-10-22Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhaoFull Text:PDF
GTID:2322330518970906Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,as yellow Delta development construction,in Dongying city and the subsidiary County Economic quickly development,Shandong province East Green road in Dongying city along sections traffic volume growth quickly,overload vehicles,and overload vehicles sharp increased,after years operations,Guangrao county Dawang town,to Qingzhou community paragraph pavement crack,and pit slot,and subsidence,disease more serious,pavement problem increasingly highlight,led to Highway lane speed,and passage capacity,and lane security sexual greatly reduced,became regional network of bottlenecks sections.To this end,the road authority decided to make alterations to the road upgrade in Dongying city,to enhance the service capability of road traffic,road safety,adapted to the needs of urban planning and future development of traffic.Tung Tsing Road,Dawang town,Qingzhou,the thesis community renovation project reality,analyzed the necessity of project construction,brief introduction of Tung Tsing Road improvement project construction scale and specific technical standards.At the same time,studied the main components of the project cost,project cost control the features and engagement,presented the main problems in project cost control.As a key project in construction of Dongying municipal government,the project put forward higher requirements on project cost control.To protect Tung Tsing Road improvement projects successful implementation of cost control,thesis was development of project cost control of general idea and key points,while primary responsibility for cost control system was perfected.And project cost control methods and measures,as well as for specific research.Development of project construction cost control at all stages of the implementation of specific measures for main problems in project cost control and cost control issues,made specific protection measures,thereby contributing to the smooth implementation of project cost control,safeguarding the effective completion of management objectives.
Keywords/Search Tags:Project cost management, Project cost structure, Cost management flow
PDF Full Text Request
Related items