Font Size: a A A

The Case Study On Material Cost Control In YH High-rise Building Project Of BoJian Company

Posted on:2018-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:G W PanFull Text:PDF
GTID:2322330569486003Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction industry is a backbone of the rapid development of various industries in recent years.With the development trend of China's urbanization,the number of real estate construction projects,the rapid development of scale,the rapid increase in the share of the construction market,and its efficiency The overall growth is not high,low technology and technology content,the overall level of low profits of the industry."Construction technology first-class,first-class construction speed,backward management,qualification is not enough,low efficiency" has been the domestic construction industry is facing several major problems,how to build a large-scale construction enterprises,standardization is the development trend of the industry.After nearly a hundred years of professional development,foreign and domestic construction companies have formed a more scientific cost control system,the cost management theory and methods are mature,and the cost of the project cost control system is also very systematic,standardized,standardization.At present,China's construction system cost management is also very mature and standardized.In the whole project construction,it mainly involves the specification of the bill,the professional construction standard,the local quota of each province and the province,and the construction enterprise.But the newly established construction company,due to its overall management model,cost management is still in the extensive management stage,although each enterprise in accordance with their actual situation to imitate the excellent experience at home and abroad,and gradually establish their own of the construction enterprises quota,but the limitations of its development is still restricting the company's meager profit margins.Based on the development of domestic construction project cost control and the development direction in the future period,this paper analyzes and summarizes the application of YH high construction project in the construction of YH high construction project.Literature review method,comparative analysis of the project material cost control of the relevant stations to qualitative research.Analysis of how to build in the construction process to grasp the use of various materials,reduce consumption,from the management,cost savings,to the management of profits.Based on the actual project,standing on the perspective of construction enterprises,the main materials for the construction of cost analysis,optimization of the cost control process,to find all the points and difficulties,the actual situation for the enterprise analysis of what is the problem,what is the problem How to produce,compare with the industry.Solution:re-standardize the company's internal material cost control process,system,constraints mechanism.
Keywords/Search Tags:YH high building, material control, system construction
PDF Full Text Request
Related items