| With the development of modern enterprise business towards business process refinement and business process complex development,the traditional workflow system has become increasingly difficult to meet the needs of enterprise business,its limitations have become increasingly prominent,the workflow management system of modern enterprises need a high flexibility and adaptability to meet the dynamic requirements of business development urgently.In the process of designing and developing building management platform with traditional workflow technology,there are two local interaction between business personnel(including the demand analysis of staff and project personnel)and developers,the first phase is in the demand analysis,the second phase is in the maintenance of the online platform.In the demand analysis phase,developers need to set the function of each step and each process operation according to the demand offered by business personnel,in the platform maintenance phase,developers need to modify codes according to the changing requirements provided by business personnel.In fact,in the process of the development and application of the platform,the more communication between developers and business personnel,the worse the efficiency of platform implementation may be.Because the two sides involved too much in the project decision-making,it will be more difficult to implement the platform.What’s more,because the business personnel is not involved in the developing of the platform,the platform will not meet the process execution when the demand change later,bringing worse efficiency of the implementation of the new process.The repeated development steps will also take time to wait for the platform modeling,development,will seriously affect the efficiency of the implementation of the enterprise.To solve the problems above,this thesis describes a construction management platform based on Activiti5 workflow management engine,and B/S architecture,using Spring MVC lightweight front-end framework,design idea and realization method of persistence layer using hibernate design engineering.The construction management platform business model centers on the actual mobile base station management business model,in view of the traditional mobile base station construction,maintenance,management process to produce the problems of the system platform to improve the level of optimization.First of all,research will be taken on the base station agent management according to the status of enterprise business needs,according to the enterprise to provide business information,on-site survey records,report documents,BPM thought to analyze the business process based on business process,make clear of business rules,risk points and implementation requirements,provide the basis for the construction of the business process,and complete the demand analysis system platform according to the research results;and then the working process of the base station agent enterprise staff general modeling,based on the investigation on the stage of development of the demand analysis system design detailed design;finally,using the base station inspection task flow model as an example,design methods and steps of the construction process of the exhibition,to build a set of construction management system based on Activiti5 workflow engine.When the business process modeling,using Activiti5’s own online process designer "Modeler Activiti" to integrate and improve the flexibility of the system. |