Font Size: a A A

Study On Behavior And General Contractor Quality Control Mechanism Under The "BOT+EPC" Mode

Posted on:2017-02-13Degree:MasterType:Thesis
Country:ChinaCandidate:H Y LuoFull Text:PDF
GTID:2349330485482685Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
As China's investment in the expansion of domestic demand is increasingly uncertain macro-policy orientation.It brought a new round of investment boom in the infrastructure sector.But with dwindling state administration investment in infrastructure so that a considerable portion of the funds needed to operate according to market rules.Followed by investment and management of highway projects increased,which means that the opportunity to take advantage of large enterprises to invest in large-scale BOT model infrastructure projects will increase.The "BOT + EPC" mode as a new management model of investment,It appears exactly conform to the trend,promptly solved the shortage of funds large-scale infrastructure projects,the management of complex,difficult issues such as quality control.In the "BOT + EPC" mode general contractor of the project in a dominant position,and also possesses the investor's identity.These traditions and different places led to the general contractor responsibility for the quality of the new model significantly increased the general contractor,general contractor change in the status and quality of responsibility led to changes in the quality of behavior.General contractor will not only strengthen the quality control of subcontractors,will be more demanding than their own quality behavior.Because the general contractor standing investor point of view of quality will consider the project life cycle,for the quality of the warranty period and operation period,general contractors and more power to resolve,even in the construction process,the general contractor and it is expected to be able to fully take into account the quality of the project,so as to solve the problem in the construction process.In the "BOT + EPC" mode,the general contractor and sometimes late in considering the case of operating and maintenance costs,and even take the initiative to improve the quality of some aspects of the project so that the project concession period later can achieve higher income.Based on this,in terms of project quality management project contractor under "BOT + EPC" mode,taking the behavior and quality control mechanisms for the general contractor for the study;The integrated use of ideas,theories and methods of Management,Behavioral Economics and Psychology,the general contractor for the behavior peculiar behavior quality and expanded(That quality control)under the "BOT + EPC" mode control content,features and regularity of mass behavior choice.Further study of the general contractor quality control mechanism acts to some extent,the general contractor on design and focus on quality conduct quality information feedback control model and the quality of decision-making model behavior based general contractor regret theory.To promote the general contractor of mass behavior tends to standardization,quality control work to strengthen and improve the general contractor for the "BOT + EPC" mode useful measures and recommendations proposed in the smooth implementation of our development and health.Finally,with specific project practice.Using the following "BOT + EPC" mode highway project general contractor unique quality behavior verification quality control model behavior.So as to control the quality of proposed measures under the "BOT + EPC" mode and general contractor Suggest.
Keywords/Search Tags:general contractors, mass behavior, regret theory, quality control, behavioral decision
PDF Full Text Request
Related items