Since reform and open,With the erosion of the development of the traditional resource consumption model,the environmental carrying capacity going down.Our country increase the importance of environment protection,combined with renewable energy sources such as wind power and solar power generation project cost falling sharply and the national policy support of subsidies,its growing economic and social benefits has made it a important choice to replace the traditional coal-fired power generation.From 2003 to 2013,with the large-scale development and utilization of wind resources nationwidely,China's wind power industry ushered in the golden decade of rapid development.Among them,the Inner Mongolia region with prominent wind resources and geographical advantages,installed to achieve the leap development of the scale of reached 24.5% of the national total installed capacity of wind power,but due to the small power load,the limited power grid peak shaving ability,and delivery channel restrictions,and many other objective conditions,wind power abandoning ration problem increasingly prominent,due to a waste of resources and economic loss at the same time,also seriously affected the sustainable development of wind power industry in the region,to explore scientific and effective trial method to ease or even solve the problem of limited electricity now has become a recent one of the region's energy industry focus.In the current domestic widely used multiple methods,relying on three aspects of comparative advantage in local wind power given ability,increasing regional electric load,reducing the pressure of off-grid send,using wind power to replace traditional coal burning to provide urban heating has become the common recognition of the most effective means,especially the use of off-peak electricity load of wind power in winter night to solve urban heating demand,but also in reducing the difficulty of grid scheduling peak shaving,ease compatibility problem between wind power and fire ones,flexible has played a positive role to promote wind power given,etc,to solve the problem is now limited electricity problem provides a reliable choice,and has a important significance in promoting the region's wind power industry more scientific and orderly development.Based on comparison study of the Three north areas commonly adopted solutions to solve the wind power abandon rationing,this title points out the thinking of using wind power heating is the most fit in the short term to Kezuohouqiin the choice of their own actual situation.And puting datang renewable energy Tongliao company Kezuohouqi wind heating project as a specific case,to introduce the design principle of wind power heating project,the project economic benefits and social spillover effects such as energy saving and emission reduction for concrete quantification,and provides including heating boiler,heating power station system,the design of the heating system of heating pipe network,including the system of the operation mode and patrol inspection system design scheme,and from the organization staff,rules and regulations and optimize the operation technology three aspects to ensure continuous operation safeguards project,comprehensive to solve given abandon the wind power project and the development of science and rationality of the valid argument.Wind heating projects indicate that not only technically preliminarily solves the problem of wind power given,also the output of wind power with power and grid load time difference coordinations,alleviate the problems of wind power and power grid resources don't match,and effectively raise the wind available hours and the project economic earnings,provides a application example and a certain theoretical significance and guiding significance to solve the problem of Inner Mongolia region and wind power electricity problem in three north area.
Keywords/Search Tags:Wind power generation, Heating with the wind power abandoned, Designing of project
PDF Full Text Request
Related items