Font Size: a A A

Project Management Subject: Feasibility Study On Mineral Resources Integration Project Of Chenghe 2# Mine

Posted on:2018-03-11Degree:MasterType:Thesis
Country:ChinaCandidate:S P HuFull Text:PDF
GTID:2359330536479347Subject:Project management
Abstract/Summary:PDF Full Text Request
In order to solve the original mineral resource development,expand the area of mining production problems,extended development of Chenghe 2# Mine mineral resources integration project for further mining of three level mineral resources,aiming at improving the overall development level of mining resources,mineral enterprises intensive development and risk control efforts,promoting the rational expand of Chenghe 2# Mine mineral resources.From the analysis of the actual progress of Chenghe 2# Mine mineral resources,resource integration has got primary achievement in solving problems on expanding production.But because of the mineral resources enterprises,especially the local coal enterprises for lacking of mining range,professional technical personnel and backward mining technology lead to the bottleneck in the continuing coal production.Facing the structure adjustment and transformation of national energy consumption structure,resource integration project whether mergers and acquisitions of small coal mine enterprises around the familiar,or mining in the depth in itself,coal resources for expanding production will face great risk.The feasibility study of mineral resources integration project has a very important theoretical and practical significance for the integration of coal resources.In this paper,through the collection of relevant literature at home and abroad about the integration of coal resources,based on the theory of government intervention,return of scale and optimization,combined with the distribution of Chenghe 2# Mine mine characteristics of mineral resources and exploitation and utilization status,made feasible and necessary of integration project,and further explore the progress of the project construction safety.Firstly,by analyzing the actual situation,production status and market situation of the existing mine in Chenghe 2# Mine,the necessity of resource integration project is analyzed.Secondly,by analyzing the risk of the project,especially the environmental risk,it demonstrates the safety and feasibility of the integrated project And through the analysis of the development conditions of new mines,the situation of mining areas,the level of production auxiliarysystem,etc.,it is technically feasible to get the integration project.Finally,the economic feasibility of the project is further analyzed by financial evaluation.The project is economically viable,On the basis of this,the mineral resources integration plan of the mine area is formulated.On the basis of realizing the reasonable development and utilization of mineral resources in the mining area,the optimal layout of mineral resources development and the intensive development of mineral resources development are realized.Regional resources integration has a certain reference and reference significance,more conducive to promote the integration of mineral resources in the development of coal mining optimization,and for local economic restructuring to bring taxes,profits,costs and other aspects of the impact of mineral-based areas can be achieved Continuous development.
Keywords/Search Tags:Chenghe 2# Mine, resource integration, feasibility analysis
PDF Full Text Request
Related items