Study On Cost Control Of Reconstruction And Extension Engineering Project Of Rs Integrated Station

Posted on:2016-02-10Degree:MasterType:Thesis
Country:ChinaCandidate:P WangFull Text:PDF
GTID:2359330536955110Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Progress,cost and quality are the three main targets in the engineering project management.Cost control is carried out throughout all time of the project,which directly affects the profit of a project and economic benefit of a construction firm.Therefore,the study of project cost control is significant to improve competitiveness of a construction firm in the market competition.This article investigated the cost control of the RS United Station construction project.In order to figure out some problems existing in the cost control process of the project and analysis the reason,this article established a system of project cost control,which facilitates the implementation of cost control for the next period of the project and the cost control of the construction firm.This article started with a brief introduction of the development and the current situation of cost control theory.Then it described some basic concepts about cost control of construction project and analyzed the situation of cost control of the RS United Station construction project.We found some problems in it and analyzed the reasons.Then we established a cost control system for this project,in which we properly set up controlling goals,clarified responsibility of cost control and split it onto certain entity or person.The construction firm should take effective measures to achieve the cost control target,like controlling cost,analyzing and predicting the trend of project cost,finding and correcting the deviations.Especially,we use the Earned Value theory,which is to control the cost immediately.To ensure the effective mechanism of cost controlling system,this article set up a serial of protective measures for the project cost control.
Keywords/Search Tags:Project Management, Cost Control, Earned Value, Cost Control System
PDF Full Text Request
Related items