Font Size: a A A

Wind Tunnel Construction Project Risk Factors Identification And Safety Countermeasures

Posted on:2016-11-20Degree:MasterType:Thesis
Country:ChinaCandidate:C ChangFull Text:PDF
GTID:2370330542961291Subject:Safety engineering
Abstract/Summary:PDF Full Text Request
The feasibility study of domestic wind tunnel construction,starting from the analysis of project risk factors for the construction of the project put forward the prevetion and improvement measures.Based on the safety standard as the basis,through scientific methods of analysis,the harmful factors identification involved,and may therefore caused the accident to judge beforehand,find the main contradiction.Through the control method,the unit content of project failure analysis method,preliminary judgement of danger.In view of its complex characteristics of wind tunnel,from the perspective of accident prevention,the safety monitoring system security and the safety interlocking system manufacture,analysis of safety interlock design demand from the safety design principle,in order to determine the design scheme.On considering the power system main structure and flow field of wind tunnel through the PLC control methods and related hardware guarantee,the full parameter identification and safety design index and control during operation.To ensure the timely control of wind tunnel super pressure surge and other special circumstances,avoid security risks existing effectively.As the same time,ensure the safety of the operating personnel.
Keywords/Search Tags:Wind Tunnel, Safety Identification, safety interlocking
PDF Full Text Request
Related items