Font Size: a A A

Environmental Impact Assessment Of Flood Control Engineering Torward North Part Of Yitong River In Jilin

Posted on:2019-05-28Degree:MasterType:Thesis
Country:ChinaCandidate:X F WangFull Text:PDF
GTID:2371330542964019Subject:Environmental engineering
Abstract/Summary:PDF Full Text Request
River connect all parts of the city,a social gathering place of the blood flow,plays an important role in the establishment of other aspects of the city's economic development,environmental improvement,characteristics.With the development of city residents increased continuously,the number of water in the city will occupy human gathered in a more important position,the construction of water system will become an important part of the human gather environment construction.For the realization of Chuhuanxingli,flood drainage,water utilization,utilization of excavation and dredging,treatment guide and bank protection etc.,governance,planning and control of water.The construction of the Hebei flood control project,in order to achieve the ability to enhance the security of the people's production and life safety Changchun City,to accelerate the healthy development of the city's economy,improve the flood control capacity of the Yitong hebei.The project for the Jilin Yitong Hebei flood control project,combined with the project of regional environmental quality,project construction and after completion of pollutant emission characteristics,the project evaluation in engineering analysis as the foundation,according to the pollution characteristics of the project,the project construction period of waste water and gas,noise,solid waste and soil erosion on the project covers an area of Environmental impact degree and scope,operation period of "three wastes" and the environmental noise as the project EIA focus,thus put forward the feasible measures for pollution control and risk prevention measures.The project for the Jilin Yitong Hebei flood control project,the construction of the project to meet the requirements of national industrial policy and environmental function zoning,the construction project covers an area of the project is reasonable and get public support.The project can solve the Changchun Yitong Hebei water problems,improving water environment,improve the water quality of the environment,the social environment benefit.Therefore,as long as the construction units to seriously implement the pollution control measures proposed in the report and suggestions and measures of ecological restoration,from an environmental perspective,this project is feasible.
Keywords/Search Tags:Yitong River, Flood Control Engineering, The environmental impact evaluation
PDF Full Text Request
Related items