| The X project is a typical large-scale coal chemical project.It has strong representativeness in the field of coal chemical industry.In the process of management,the concept of procurement management is relatively new.It is expected that the project will be completed at the end of 2018,and it will have a strong timeliness and reference value through the whole process.This paper expounds the background of the X project and the significance of studying the purchasing strategy of the project,and gives a brief account of the related knowledge about the management of project procurement and project procurement,and summarizes 3 different procurement management modes,such as the proprietor procurement mode,the procurement mode of the general contractor of EPC,the procurement mode of the EPCM contractor and so on.The analysis of standard management,centralized procurement,supplier management,contract management and information management platform is carried out to analyze the problems existing in the procurement process and management process of the X project through five strengthening,namely,strengthening the management of the bidding,strengthening the management of centralized procurement,strengthening the management of the suppliers,strengthening the management of the contract,and strengthening the management of the contract.Strong risk control and improvement of information management platform to reduce purchasing time,reduce purchasing cost,optimize purchasing process and reduce purchasing risk,so as to improve the efficiency of purchasing management and enhance the core competitive ability of enterprises in the whole market.In order to improve the efficiency of purchasing and reduce the risk of purchasing.Project procurement management is a connecting link between the preceding and the following,which has a direct impact on the whole construction cycle,total investment and overall quality of the project.It has an indirect effect on the construction of an essential security type enterprise.Through the summary of the X project procurement work,the paper studies the background,problems and Strategies of the project procurement strategy formulation.By making more appropriate procurement strategies to guide the procurement management of the next project,the procurement work is carried out "according to law and fair and efficient",and the whole process control is established and perfected.A management system with constraints between every part.And it can ensure that the quality of the project and the time nodes can be completed within the specified time.On this basis,the maximum cost can be reduced and the management benefits of purchasing management can be completed.The contradiction between the coordinated design,procurement,construction,cost,progress and quality of the large project management should be promoted to provide scientific basis and practical experience for the management of the core interests such as the full use of free time difference,the struggle for local interests and the process of maximizing the overall interests. |